
LM-79 Moving Detector Goniophotometer (Mirror Type C)
LSG-6000

High Precision Rotation Luminaire Goniophotometer
LSG-1890B

High Precision Rotation Luminaire Goniospectroradiometer
LSG-1890BCCD

Goniophotometer for Automotive and Signal Lamps
LSG-1950

Goniophotometer for Traffic Signal Lamps
LSG-1950S

Compact Goniophotometer
LSG-1200A

Near Field Moving Detector Goniophotometer
LSG-1900B





















Select an organization
to browse standards
Product No: GNGPL-57C14
This Gauges C 14 of CEE7 for Dimensions of Mounting Boxes of 10/16A 250V Two-pole Flush-type Socket-outlets is a specialized dimensional verification gauge developed in strict compliance with the IECEE CEE-7 “Specification for plugs and socket-outlets for domestic and similar purpose” C 14 standard. It is specifically designed for inspecting the dimensions of mounting boxes used with 10/16A 250V two-pole flush-type socket-outlets, ensuring the mounting boxes meet precise dimensional requirements to enable proper installation and compatibility with the corresponding socket-outlets.
Specifications:
• Complies with IECEE CEE-7 “Specification for plugs and socket-outlets for domestic and similar purpose” C 14 standard
• Applicable to mounting boxes of 10/16A 250V two-pole flush-type socket-outlets
• Focuses on dimensional verification of target mounting boxes
• Manufacturing tolerances for all dimensions are ±0.05 mm
• Allows insertion into the mounting box without undue force, with the gauge’s flange resting on the top of the box
• Compatible with fixation using two 3 mm diameter screws
• Features specified dimensional parameters (including radii and linear measurements) in metric (mm) units
Test Procedures:
• Prepare the 10/16A 250V two-pole flush-type socket-outlet mounting box that requires dimensional verification.
• Place the mounting box on a flat, stable surface to ensure accuracy during the test.
• Align the gauge with the opening of the mounting box, ensuring correct positional alignment.
• Insert the gauge into the mounting box gently, applying no undue force throughout the process.
• Check if the flange of the gauge securely rests on the top of the mounting box, indicating proper dimensional fit.
• Use two 3 mm diameter screws to fix the gauge to the mounting box and verify the stability of the connection.
• Confirm that all dimensional and installation requirements specified in the CEE-7 C 14 standard are met; if insertion is forced or the flange fails to rest properly, the mounting box does not comply with specifications.
Applications:
• Dimensional inspection of mounting boxes during the production of 10/16A 250V two-pole flush-type socket-outlets
• Quality control in manufacturing facilities to ensure batch consistency of mounting boxes
• Compliance verification for mounting boxes to meet IECEE CEE-7 C 14 standard requirements
• Dimensional validation for mounting box prototypes in R&D processes
• On-site installation verification by electricians to ensure compatibility with flush-type socket-outlets
• Third-party testing and certification of mounting boxes for market access
• Inventory quality auditing and maintenance checks for existing mounting box stock

Gauges C 14 of CEE7 for Dimensions of Mounting Boxes of 10/16A 250V Two-pole Flush-type Socket-outlets
© Copyright 2003 | Blog | Privacy
surge generator | emc test system | emi receiver | electrical safety tester | temperature chamber | salt spray test | environmental chamber | Sitemap

To provide the best experiences, we and our partners use technologies like cookies to store and/or access device information. Consenting to these technologies will allow us and our partners to process personal data such as browsing behavior or unique IDs on this site and show (non-) personalized ads. Not consenting or withdrawing consent, may adversely affect certain features and functions.
Click below to consent to the above or make granular choices. Your choices will be applied to this site only. You can change your settings at any time, including withdrawing your consent, by using the toggles on the Cookie Policy, or by clicking on the manage consent button at the bottom of the screen.

中文简体
